Bridge in port of Rotterdam to reopen double track, but not in strong wind

Suurhoffbrug. Source: © Paul van Baardwijk

It is again possible to travel with two trains at the same time over the Suurhoff Bridge to the Maasvlakte. Trains can now safely cross the bridge, even with winds up to 44 km/h (wind force 6). Since 2 June, the bridge was only accessible on a single track, because ProRail, the Dutch infrastructure manager, found that there was corrosion. As a result, the bridge no longer met the safety standards when two freight trains passed over it.

Subscribe to gain access to all news

Already have a subscription? Log in.

Choose your subscription

Considering a corporate subscription? Contact us to find out more.


Or

Want to read this article for free?

You can read one free article per month. Enter your email and we'll send you a free link to access the full article. No payment required.

Author: Marco Raimondi

Marco Raimondi is an editor of RailFreight.com, the online magazine for rail freight professionals.

Add your comment

characters remaining.

Log in through one of the following social media partners to comment.

Subscribe to gain access to all news

Already have a subscription? Log in.

Choose your subscription

Considering a corporate subscription? Contact us to find out more.


Or

Want to read this article for free?

You can read one free article per month. Enter your email and we'll send you a free link to access the full article. No payment required.